Add 1: exhaust drying tower outlet change? DFD make DMN, elbow toward downward.
2 new: air cooling water circulating pump compressor inlet end increased type Y filter problem? Main pipe already set filter. No need.
3 new: pipe compressed air in the gallery of the main pipeline has the installation manual drain valve, whether also need to install the air traps? From the point of view of design need not set.
4 new fire hydrant system and sprinkler system: share a pressure relief pipe (DN100), how to realize the pressure relief, how to set the pressure relief valve pressure values (pressure relief value)? DFD make DMN for this topic.
added 5:EC1 / EC2 whether to increase the fire pump adapter? (FM asks why foundry north, Center for energy?) From Design aspect, not necessary.
added 6: diesel pump pressure relief valve (DN200), pressure value should be set how many Mpa? Chen Dong and Liu Xiaobei communicate ITT then give pressure. 7:FM hot water tank regulator
new proposed no connection between valve and safety valve pipe, please confirm whether the need to increase the valve, according to the design and construction of our. As per Chinese code, forbidden set valves after and before safety valves.
Add 8: heat exchange station vacuum exhaust device and the competent connection whether it is necessary to increase the control valve? (FM is proposed to increase the valve) DFD make DMN.
9 new water tank: increase the lacing matters (FM in order to ensure the use reliability requirements, increase)? As per GB code on drawing.
10 new: the drainage pipe (hot water) whether it is necessary to increase the sliding support? Investigation on site, then answer.
11 new: system switching problem, cooling tower of wet and dry run when to switch, two cooling plate change when to invest? OPB will submit operation information.